New Variation

Create a variation order for a contract change

Variation Details
Subcontractor Quote
Link subcontractor quotes to this variation (optional)

Link a subcontractor quote to this variation:

$
Additional Cost Items
Add manual cost items not covered by subcontractor quotes
$
Variation Summary
Subtotal (ex GST)$0
GST (10%)$0
Total (inc GST)$0

Audit Trail

When submitted, all linked quotes, margin applied, and cost items will be locked as an audit record and cannot be changed retrospectively.